What should you do when your LoBs say they are not ready for S/4HANA – part 2, Why choice of Infrastructure matters

Conversions to S/4HANA usually take place over several months and involve dozens to hundreds of steps.  With proper care and planning, these projects can run on time, within budget and result in a final Go-Live that is smooth and occurs within an acceptable outage window.  Alternately, horror stories abound of projects delayed, errors made, outages far beyond what was considered acceptable by the business, etc.  The choice of infrastructure to support a conversion may the last thing on anyone’s mind, but it can have a dramatic impact on achieving a successful outcome.

A conversion includes running many pre-checks[i] which can run for quite a while[ii] which implies that they can drive CPU utilization to high levels for a significant duration and impact other running workloads.  As a result, consultants routinely recommend that you make a copy of any system, especially production, against which you will run these pre-checks.  SAP recommends that you run these pre-checks against every system to be converted, e.g. Development, Test, Sandbox, QA, etc.  If they are being used for on-going work, it may be advisable to also make a copy of them and run those copies on other systems or within virtual machines which can be limited to avoid causing performance issues with other co-resident virtual machines.

In order to find issues and correct them, conversion efforts usually involve a phased approach with multiple conversions of support systems, e.g. Dev, Test, Sandbox, QA using a tool such as SAP’s Systems Update Manager with the Database Migration Option (SUM w/DMO).  One of the goals of each run is to figure out how long it will take and what actions need to be taken to ensure the Go-Live production conversion completes within the required outage window, including any post-processing, performance tuning, validation and backups.

In an attempt to keep expenses low, many customers will choose to use existing systems or VMs or systems in addition to a new “target” system or systems if HA is to be tested.  This means that the customer’s network will likely be used in support of these connections.  Taken together, the use of shared infrastructure components may come into opposition with events among the shared components which can impacts these tests and activities.  For example, if a VM is used but not enough CPU or network bandwidth is provided, the duration of the test may extend well beyond what is planned meaning more cost for per-hour consulting and may not provide the insight into what needs to be fixed and how long the actual migration may take.  How about if you have plenty of CPU capacity or even a dedicated system, but the backup group decides to initiate a large database backup at the same time and on the same network as your migration test is using.  Or maybe, you decide to run a test at a time that another group, e.g. operations, needs to test something that impacts it or when new equipment or firmware is being installed and modifications to shared infrastructure are occurring, etc.  Of course, you can have good change management and carefully arrange when your conversion tests will occur which means that you may have restricted windows of opportunity at times that are not always convenient for your team.

Let’s not forget that the application/database conversion is only one part of a successful conversion.  Functional validation tests are often required which could overwhelm limited infrastructure or take it away from parallel conversion tasks.  Other easily overlooked but critical tasks include ensuring all necessary interfaces work; that third party middleware and applications install and operate correctly; that backups can be taken and recovered; that HA systems are tested with acceptable RPO and RTO; that DR is set up and running properly also with acceptable RPO and RTO.  And since this will be a new application suite with different business processes and a brand new Fiori interface, training most likely will be required as well.

So, how can the choice of infrastructure make a difference to this almost overwhelming set of issues and requirements?  It comes down to flexibility.  Infrastructure which is built on virtualization allows many of these challenges to be easily addressed.  I will use an existing IBM Power Systems customer running Oracle, DB2 or Sybase to demonstrate how this would work.

The first issue dealt with running pre-checks on existing systems.  If those existing systems are Power Systems and enough excess capacity is available, PowerVM, the IBM Virtualization Hypervisor, allows a VM to be  started with an exact copy of production, passed through normal post-processing such as BDLS to create a non-production copy or cloned and placed behind a network firewall.  This VM could be fenced off logically and throttled such that production running on the same system would always be given preference for cpu resources.  By comparison, a similar database located on an x86 system would likely not be able to use this process as the database is usually running on bare-metal systems for which no VM can be created.

Alternately, for Power Systems, the exact same process could be utilized to carve out a VM on a new HANA target system and this is where the real value starts to emerge.  Once a copy or clone is available on the target HANA on Power system, as much capacity can be allocated to the various pre-checks and related tasks as needed without any concern for the impact on production or the need to throttle these processes thereby optimizing the duration of these tasks.  On the same system, HANA target VMs may be created.  As mock conversions take place, an internal virtual network may be utilized.  Not only is such a network faster by a factor of 2 or more, but it is dedicated to this single purpose and completely unaffected by anything else going on within the datacenter network.  No coordination is required beyond the conversion team which means that there is no externally imposed delay to begin a test or constraints on how long such a test may take or, for that matter, how many times such a test may be run.

The story only gets better.  Remember, SAP suggests you run these pre-checks on all non-prod landscapes.  With PowerVM, you may fire up any number of different copy/clone VMs and/or HANA VMs.  This means that as you move from one phase to the next, from one instance to the next, from conversion to production, run a static validation environment while other tasks continue, conduct training classes, run many different phases for different projects at the same time, PowerVM enables the system to respond to your changing requirements.  This helps avoid the need to purchase extra interim systems and buy when needed, not significantly ahead of time due to the inflexibility of other platforms.  You can even simulate an HA environment to allow you to test your HA strategy without needing a second system, up to the physical limits of the system, of course.  This is where a tool like SAP’s TDMS, Test Data Migration Server, might come in very handy.

And when it comes time for the actual Go-Live conversion, the running production database VM may be moved live from the “old” system, without any downtime, to the “new” system and the migration may now proceed using the virtual, in-memory network at the fastest possible speed and with all external factors removed.  Of course, if the “old” system is based on POWER8, it may then be used/upgraded for other HANA purposes.  Prior Power Systems as well as current generation POWER8 systems can be used for a wide variety of other purposes, both SAP and those that are not.

Bottom line: The choice of infrastructure can help you eliminate external influences that cause delays and complications to your conversion project, optimize your spend on infrastructure, and deliver the best possible throughput and lowest outage window when it comes to the Go-Live cut-over.  If complete control over your conversion timeline was not enough, avoidance of delays keeps costs for non-fixed cost resources to a minimum.  For any SAP customer not using Power Systems today, this flexibility can provide enormous benefits, however the process of moving between systems would be somewhat different.  For any existing Power Systems customer, this flexibility makes a move to HANA on Power Systems almost a no-brainer, especially since IBM has so effectively removed TCA as a barrier to adoption.

[i] https://blogs.sap.com/2017/01/20/system-conversion-to-s4hana-1610-part-2-pre-checks/

[ii] https://uacp.hana.ondemand.com/http.svc/rc/PRODUCTION/pdfe68bfa55e988410ee10000000a441470/1511%20001/en-US/CONV_OP1511_FPS01.pdf page 19

April 26, 2017 Posted by | Uncategorized | , , , , , , , , , | Leave a comment